Saturday, December 6, 2025
  • About Web3Wire
  • Web3Wire NFTs
  • .w3w TLD
  • $W3W Token
  • Web3Wire DAO
  • Media Network
  • RSS Feed
  • Contact Us
Web3Wire
No Result
View All Result
  • Home
  • Web3
    • Latest
    • AI
    • Business
    • Blockchain
    • Cryptocurrencies
    • Decentralized Finance
    • Metaverse
    • Non-Fungible Token
    • Press Release
  • Technology
    • Consumer Tech
    • Digital Fashion
    • Editor’s Choice
    • Guides
    • Stories
  • Coins
    • Top 10 Coins
    • Top 50 Coins
    • Top 100 Coins
    • All Coins
  • Exchanges
    • Top 10 Crypto Exchanges
    • Top 50 Crypto Exchanges
    • Top 100 Crypto Exchanges
    • All Crypto Exchanges
  • Stocks
    • Blockchain Stocks
    • NFT Stocks
    • Metaverse Stocks
    • Artificial Intelligence Stocks
  • Events
  • News
    • Latest Crypto News
    • Latest DeFi News
    • Latest Web3 News
  • Home
  • Web3
    • Latest
    • AI
    • Business
    • Blockchain
    • Cryptocurrencies
    • Decentralized Finance
    • Metaverse
    • Non-Fungible Token
    • Press Release
  • Technology
    • Consumer Tech
    • Digital Fashion
    • Editor’s Choice
    • Guides
    • Stories
  • Coins
    • Top 10 Coins
    • Top 50 Coins
    • Top 100 Coins
    • All Coins
  • Exchanges
    • Top 10 Crypto Exchanges
    • Top 50 Crypto Exchanges
    • Top 100 Crypto Exchanges
    • All Crypto Exchanges
  • Stocks
    • Blockchain Stocks
    • NFT Stocks
    • Metaverse Stocks
    • Artificial Intelligence Stocks
  • Events
  • News
    • Latest Crypto News
    • Latest DeFi News
    • Latest Web3 News
No Result
View All Result
Web3Wire
No Result
View All Result
Home Artificial Intelligence

Orezone Reports Third Quarter 2024 Results

November 6, 2024
in Artificial Intelligence, GlobeNewswire, Web3
Reading Time: 28 mins read
5
SHARES
243
VIEWS
Share on TwitterShare on LinkedInShare on Facebook

All dollar amounts are in USD unless otherwise stated and abbreviation “M” means million.

VANCOUVER, British Columbia, Nov. 05, 2024 (GLOBE NEWSWIRE) —  Orezone Gold Corporation (TSX: ORE, OTCQX: ORZCF) (“Orezone” or “Company”) reported its operational and financial results for the three and nine months ended September 30, 2024. The Company will host a conference call and webcast on November 6, 2024 commencing at 8:00am PT to discuss its quarterly and year-to-date performance, and outlook for the remainder of the year, including commentary on the progress of its Phase II hard rock expansion and early success on its multi-year, discovery-focus drilling campaign. Call access and webcast details are provided at the end of this press release.

Patrick Downey, President and CEO, commented, “The third quarter provided a number of positive developments for our Bomboré Mine. Operationally, mining access was opened up in the Siga pits and grid power returned to normalized levels, both of which will ensure ongoing improved gold production and costs in Q4-2024. We generated solid free cash flow during the quarter and continued to pay down debt and advance the Phase II hard rock expansion which will set the path for Bomboré to increase annual gold production by 50% within the next 12 months. We also commenced our multi-year exploration program with the first two diamond drill holes from the current campaign returning robust results, with broad and above-average grade mineralization to 240 metres below the current pit limit, validating our belief that with further targeted drilling, Bomboré can grow into a 7 to 10 million ounce orebody.

With unhedged gold sales at record prices continuing into the fourth quarter, we forecast generation of continued strong operating cashflow that will help support the Phase II expansion construction. The $58M Phase II term loan previously announced with Coris Bank is advancing and is expected to close in the coming weeks.”

2024 THIRD QUARTER HIGHLIGHTS AND SIGNIFICANT SUBSEQUENT EVENTS

(All mine site figures on a 100% basis)   Q3-2024 Q3-2023 9M-2024 9M-2023
Operating Performance          
Gold production oz 26,581 30,726   82,244   107,509
Gold sales oz 27,698 29,167   83,864   105,914
Average realized gold price $/oz 2,473 1,910   2,280   1,922
Cash costs per gold ounce sold1 $/oz 1,410 1,152   1,297   936
All-in sustaining costs1 (“AISC”) per gold ounce sold $/oz 1,655 1,306   1,519   1,088
Financial Performance          
Revenue $000s 68,652 55,803   191,680   203,911
Earnings from mine operations $000s 22,340 13,882   72,389   81,042
Net income attributable to shareholders of Orezone1 $000s 4,984 5,194   25,620   39,134
Net income per common share attributable to shareholders of Orezone1
Basic
Diluted

$
$

0.01
0.01

0.01
0.01

 

0.07
0.06

 

0.11
0.11

Adjusted EBITDA1 $000s 25,756 19,163   72,175   93,334
Adjusted earnings attributable to shareholders of Orezone1 $000s 7,365 3,588   18,427   39,398
Adjusted earnings per share attributable to shareholders of Orezone1 $ 0.02 0.01   0.05   0.11
Cash and Cash Flow Data          
Operating cash flow before changes in working capital $000s 18,888 16,474   53,876   82,839
Operating cash flow $000s 24,043 6,978   29,677   66,059
Free cash flow1 $000s 14,120 (4,024 ) (818 ) 35,490
Cash, end of period $000s 66,900 27,711   66,900   27,711

1 Cash costs, AISC, Adjusted EBITDA, Adjusted earnings, Adjusted earnings per share, and Free cash flow are non-IFRS measures. See “Non-IFRS Measures” section below for additional information.

  • Safety: Continued strong safety performance with 1.31M and 3.68M hours worked without a lost-time injury for Q3-2024 and 9M-2024, respectively.
  • Liquidity: Free cashflow generation of $14.1M in Q3-2024 despite the continued build-up of VAT receivables and Phase II Expansion capital expenditures in the quarter. Cash stood at $66.9M at September 30, 2024, increases of $55.5M from June 30, 2024 and $47.4M from December 31, 2023, respectively.    
  • Gold Production and Costs:   Gold production of 26,581 ounces at an AISC of $1,655/oz as a result of an above-average strip ratio due to mine sequencing, and drawdown of lower-grade stockpiles due to heavy rainfall events restricting pit access during the quarter combined with higher-than-budgeted government royalties from a better realized gold price.
  • Siga Pits Mining Extension: Mining at Siga East ramped up in Q3-2024 after the relocation of households to the new MV3 resettlement site in June 2024 while mining at Siga South commenced in August 2024. The Q4-2024 mine plan calls for greater mill delivery of higher-grade ore tonnes from the Siga pits as mining productivity and material movement are forecasted to improve with the end of the rainy season and the recent expansion of the contractor mining fleet. Two new heavy-duty excavators and twenty new haul trucks were mobilized to site at the end of October and were placed into service at the start of November. As a result, quarterly gold production is expected to be the highest in Q4-2024 as demonstrated by the production of 12,096 gold ounces in October.
  • Phase II Hard Rock Expansion (“Phase II Expansion”) Approval: The Company announced on July 10, 2024 that its Board of Directors had approved the Phase II Expansion after securing over $105M in new debt and equity for the construction. On August 8, 2024, the Company completed the issuance of 92,743,855 common shares at a share price of C$0.70 for net proceeds of C$64.8M ($47.3M). Concurrently, the Company is working on closing its XOF 35.0 billion ($58M) senior secured loan (“Phase II Term Loan”) with Coris Bank International (“Coris Bank”) in November 2024. The draft loan agreement with Coris Bank is in final form and the Company is now arranging for intercreditor consents from the convertible debenture holders for this additional senior debt.      
  • Phase II Expansion Early Achievements: Expansion activities are advancing ahead of schedule while committed costs are tracking on budget. The Company has placed over 50% of all packages, including CIL tank platework and 95% of all process equipment, including the purchase of a new, pre-owned 9MW 26’ diameter SAG mill. For site activities, all bulk earthwork is complete, and the laydown area is ready to receive deliveries. Rapid progress on major site contracts such as concrete will see these contracts awarded early, thereby adding further float to the schedule for first gold. For the 9M-2024, the Company has expended $9.8M on both early works and the on-going Phase II Expansion, and expects to expend a further $9M – $12M in Q4-2024 as the Company rapidly advances the expansion towards first gold in Q4-2025.
  • Multi-year Exploration Campaign Commencement: The Company initiated a 30,000 m, multi-year discovery focused drill program designed to test the broader size and scale of the Bomboré mineralized system with the goal of increasing the Bomboré global resource to 7M to 10M gold ounces. Results from the first two drill holes at the North Zone intercepted mineralization 240 m below the current reserve pit limit, including 1.67 g/t gold over 46.00 m, demonstrating the continuity of the mineralized system at depth, both in terms of grade and overall width (see the Company’s October 10, 2024 news release). Additional drill results from the next round of drilling are set for release before the end of 2024.
  • Better Grid Power Availability: Availability of grid power normalized in Q3-2024 with the national grid supplying 92% of Bomboré mine’s power needs, up significantly from Q2-2024 when grid power provided only 34% of power consumption.  
  • Debt Reduction: Scheduled principal repayments of XOF 3.0 billion ($5.0M) were made in Q3-2024 on the Company’s Phase I senior loan with Coris Bank.

2024 Guidance for Bomboré Mine

Operating Guidance (100% basis) Unit Original
2024 Guidance
Revised
2024 Guidance
9M-2024
Actuals
Gold production Au oz 110,000 – 125,000 Unchanged   82,244
All-In Sustaining Costs123 $/oz Au sold $1,300 – $1,375 $1,400 – $1,475 $1,519
Sustaining capital2 $M $14 – $15 Unchanged $11.7
Growth capital – non Phase II Expansion2 $M $16 – $17 Unchanged $13.2
Growth capital – Phase II Expansion early works2 $M No guidance provided $3.6 $3.6
Growth capital – Phase II Expansion2 $M No guidance provided $15.0 – $18.0 $6.2
  1. AISC is a non-IFRS measure. See “Non-IFRS Measures” section below for additional information.
  2. Foreign exchange rates used to forecast cost metrics include XOF/USD of 600 and CAD/USD of 1.30.
  3. Government royalties of $160/oz included in original AISC guidance based on an assumed gold price of $2,000 per oz. Government royalties of $200/oz is now estimated in the revised AISC guidance from a better gold price realized.

2024 gold production is expected to be at or above the mid-point of guidance with AISC now guided to fall within $1,400/oz to $1,475/oz, a minor increase to the original guidance, mainly due to the impact of higher power costs from the lack of grid availability in H1-2024 (~$60/oz) and from higher government royalties (~$40/oz) on better realized gold prices.

Sustaining capital for 2024 is expected to reach the low-end of the $14M – $15M guidance range as spending in Q4-2024 will be limited mainly to the ongoing tailings storage facility (“TSF”) expansion (stage 4 lift) and completion of the new on-site explosives magazine.

Growth capital consists of two carryover projects from 2023:

      (i)      Power connection to Burkina Faso’s national grid (9M-2024 actuals: $1.4M)

The powerline was energized in January 2024, and system commissioning of the new line and substations were completed in March 2024. Remaining equipment and software upgrades to shorten the transfer between the grid and back-up gensets, and to reduce the quantity of reactive power are expected to be implemented by year-end.

      (ii)      Resettlement Action Plan (“RAP”) – Phases II and III (9M-2024 actuals: $11.8M)

RAP Phases II and III commenced in 2023 and will see the construction of over 2,200 private and public structures in three new resettlement communities (MV3, MV2, and BV2) to help relocate communities occupying areas in the southern half of the Bomboré mining permit.

The Company successfully relocated families to the new MV3 resettlement site in June 2024 and is currently constructing the new MV2 resettlement site with construction progress reaching 85% at the end of Q3-2024. Relocation of households to MV2 and the start of construction works at BV2 are scheduled for in Q4-2024.

RAP spending, including costs for compensation, consultants, relocation allowances, and livelihood restoration programs, is forecasted to remain unchanged at between $15M to $16M for 2024.

BOMBORÉ GOLD MINE (100% BASIS) – OPERATING HIGHLIGHTS

    Q3-2024 Q3-2023 9M-2024 9M-2023
Safety          
Lost-time injuries frequency rate per 1M hrs 0.00 0.00   0.00 0.00  
Personnel-hours worked 000s hours 1,308 1,128   3,680 3,093  
Mining Physicals          
Ore tonnes mined tonnes 1,457,631 2,231,360   5,826,711 6,364,169  
Waste tonnes mined tonnes 2,690,759 2,654,010   9,265,615 8,188,409  
Total tonnes mined tonnes 4,148,390 4,885,370   15,092,326 14,552,578  
Strip ratio waste:ore 1.85 1.19   1.59 1.29  
Processing Physicals          
Ore tonnes milled tonnes 1,491,740 1,453,541   4,275,755 4,299,394  
Head grade milled Au g/t 0.64 0.74   0.68 0.86  
Recovery rate % 87.4 88.8   87.8 90.9  
Gold produced Au oz 26,581 30,726   82,244 107,509  
Unit Cash Cost          
Mining cost per tonne $/tonne 3.76 3.19   3.49 2.99  
Mining cost per ore tonne processed $/tonne 9.58 7.79   8.85 6.93  
Processing cost $/tonne 7.94 9.80   8.77 9.90  
Site general and admin (“G&A”) cost $/tonne 3.77 3.98   3.84 3.64  
Cash cost per ore tonne processed $/tonne 21.29 21.57   21.46 20.47  
Cash Costs and AISC Details          
Mining cost (net of stockpile movements) $000s 14,295 11,319   37,834 29,786  
Processing cost $000s 11,846 14,238   37,486 42,566  
Site G&A cost $000s 5,617 5,787   16,405 15,671  
Refining and transport cost $000s 51 66   304 378  
Government royalty cost $000s 5,500 3,503   15,227 12,345  
Gold inventory movements $000s 1,748 (1,303 ) 1,539 (1,584 )
Cash costs1 on a sales basis $000s 39,057 33,610   108,795 99,162  
Sustaining capital $000s 4,453 2,606   11,752 10,444  
Sustaining leases $000s 73 41   219 228  
Corporate G&A cost $000s 2,255 1,837   6,643 5,451  
All-In Sustaining Costs1 on a sales basis $000s 45,838 38,094   127,409 115,285  
Gold sold Au oz 27,698 29,167   83,864 105,914  
Cash costs per gold ounce sold1 $/oz 1,410 1,152   1,297 936  
All-In Sustaining Costs per gold ounce sold1 $/oz 1,655 1,306   1,519 1,088  

1 Non-IFRS measure. See “Non-IFRS Measures” section for additional details.

Bomboré Production Results

Q3-2024 vs Q3-2023

Gold production in Q3-2024 was 26,581 ounces, a decline of 13% from the 30,726 ounces produced in Q3-2023. The lower gold production is attributable to a 14% decrease in head grades and a 2% decrease in plant recoveries, partially offset by a 3% increase in plant throughput. The better head grades in Q3-2023 were from the sequencing of higher-grade pits in earlier periods of the mine plan, and greater ore release from more tonnes mined allowing for the stockpiling of lower-grade ore. Less tonnes were mined in Q3-2024 due to lower contractor equipment availability and heavier-than-average rainfall events combined with mining rates in Q3-2023 benefiting from the deployment of a second mining contractor. Pre-stripping activities at the Siga pits increased the strip ratio (1.85 vs 1.19) in Q3-2024, leading to the temporary drawdown of lower grade stockpiles to maintain mill throughput in August 2024. Plant recoveries for Q3-2024 were marginally lower from the greater blend of transition ore in the mill feed as mining deepens in certain pits. The presence of transition ore results in slightly lower metallurgical recoveries and additional plant maintenance due to the harder nature of the ore. Plant throughput increased in Q3-2024 as the Company successfully improved hourly plant throughput by increasing mill power draw and reducing residence time in the CIL circuit without a noticeable effect of recovery rates. Plant throughput was further impacted in Q3-2024 by a ball mill reline performed at the end the quarter (no comparable mill reline in Q3-2023). This mill reline was brought forward from Q4-2024 to ensure maximum mill availability during Q4-2024 when higher-grade ore from the SIGA pits is mined.

Plant throughput, head grades, and recoveries in Q4-2024 are expected to improve quarter-over-quarter as mining ramps up at Siga East and Siga South for the full quarter, with more contribution of higher-grade, softer ore to the mill feed, and from the completion of all scheduled major plant maintenance in earlier periods of the year.

9M-2024 vs 9M-2023

Gold production in 9M-2024 was 82,244 ounces, a decline of 24% from the 107,509 ounces produced in 9M-2023. The lower gold production is attributable to a 20% decrease in head grades, a 3% decrease in plant recoveries, and a 1% decrease in plant throughput. Head grades were higher in 9M-2023 as a result of processing high-grade stockpiles accumulated during the Phase I construction, which were fully depleted by June 2023, and from the sequencing of higher-grade pits in earlier periods of the mine plan. Plant recoveries were lower in 9M-2024 mainly from a greater blend of transition ore. Plant throughput was marginally lower in 9M-2024 due to plant downtime in Q2-2024 caused by frequent grid blackouts and power dips, and time lost to switch to back-up gensets. Grid availability returned to normal levels beginning in July 2024 and with steady grid power, plant throughput is expected to reach a quarterly record in Q4-2024.

Bomboré Operating Costs

Q3-2024 vs Q3-2023

AISC per gold ounce sold in Q3-2024 was $1,655, a 27% increase from $1,306 per ounce sold in Q3-2023. The higher AISC is primarily the result of: (a) a 14% decline in Q3-2024 gold production as explained above; (b) greater per ounce royalty costs from new royalty rates that took effect in October 2023, coupled with a 29% higher realized selling price ($2,473/oz vs $1,910/oz); and (c) increased unit mining costs with deeper pits, drill-and-blast associated with harder transition ore mined, and higher strip ratio, partially offset by a reduction in power costs from the utilization of lower-cost grid energy.

Cash cost per ore tonne processed in Q3-2024 was $21.29 per tonne, a decrease of 1% from $21.57 per tonne in Q3-2023 mainly from the use of lower-cost grid power in Processing ($7.94/tonne vs $9.80/tonne) and lower site G&A costs ($3.77/tonne vs $3.98/tonne) from tight spending control, partially offset by a 23% increase ($9.58/tonne versus $7.79/tonne) in mining costs per ore tonne processed.

Mining costs have increased as lower benches are mined resulting in longer hauls and more transition material that requires some drill-and-blast prior to excavation and greater rehandle prior to feeding into the dump pocket on the ROM pad. In addition, unit costs have increased from a higher strip ratio from the pre-stripping of the Siga pits and the waste pushback to the H1 pit that experienced a minor wall failure in 2023.

Processing costs per ore tonne have benefitted from the introduction of grid power to the Bomboré mine in February 2024 with power cost per tonne dropping to $2.80/tonne in Q3-2024 from $4.94/tonne in Q3-2023, a decrease of $2.14/tonne. Further savings in power costs were offset by a greater blend of transition ore requiring higher per tonne consumption of power and from the rental and use of back-up diesel gensets to supply power when the grid was unavailable. Grid utilization dramatically improved in Q3-2024 at 92% versus 34% in Q2-2024 when issues with the supply system in Ghana and Côte D’Ivoire temporarily reduced the export of power into Burkina Faso. Processing costs in Q3-2024 was also impacted by higher maintenance costs from the ball mill reline.

9M-2024 vs 9M-2023

AISC per gold ounce sold in 9M-2024 was $1,519, a 40% increase from $1,088 per ounce sold in 9M-2023. The higher AISC were due namely for the same reasons as explained in the above section.

NON-IFRS MEASURES

The Company has included certain terms or performance measures commonly used in the mining industry that is not defined under IFRS, including “cash costs”, “AISC”, “EBITDA”, “adjusted EBITDA”, “adjusted earnings”, “adjusted earnings per share”, and “free cash flow”. Non-IFRS measures do not have any standardized meaning prescribed under IFRS, and therefore, they may not be comparable to similar measures presented by other companies. The Company uses such measures to provide additional information and they should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. For a complete description of how the Company calculates such measures and reconciliation of certain measures to IFRS terms, refer to “Non-IFRS Measures” in the Management’s Discussion and Analysis for the three and nine months ended September 30, 2024 which is incorporated by reference herein.

CONFERENCE CALL AND WEBCAST

The condensed consolidated interim financial statements and Management’s Discussion and Analysis are available at http://www.orezone.com and on the Company’s profile on SEDAR+ at http://www.sedarplus.ca. Orezone will host a conference call and audio webcast to discuss 2024 third quarter results on November 6, 2024 at 8:00am PT (11:00am ET).

Webcast
Date:    Wednesday, November 6, 2024
Time:    8:00 am Pacific time (11:00 am Eastern time)
Please register for the webcast here:  Orezone Q3-2024 Conference Call and Webcast

Conference Call

Toll-free in U.S. and Canada: 1-800-715-9871
International callers: +646-307-1963
Event ID: 9776163

QUALIFIED PERSONS
The scientific and technical information in this news release was reviewed and approved by Mr. Rob Henderson, P. Eng, Vice-President of Technical Services and Mr. Dale Tweed, P. Eng., Vice-President of Engineering, both of whom are Qualified Persons as defined under NI 43-101 Standards of Disclosure for Mineral Projects.

About Orezone Gold Corporation

Orezone Gold Corporation (TSX: ORE OTCQX: ORZCF) is a West African gold producer engaged in mining, developing, and exploring its 90%-owned flagship Bomboré Gold Mine in Burkina Faso. The Bomboré mine achieved commercial production on its Phase I oxide operations on December 1, 2022, and is now proceeding with its staged Phase II hard rock expansion that is expected to materially increase annual and life-of-mine gold production from the processing of hard rock mineral reserves. Orezone is led by an experienced team focused on social responsibility and sustainability with a proven track record in project construction and operations, financings, capital markets, and M&A.   

The technical report entitled Bomboré Phase II Expansion, Definitive Feasibility Study is available on SEDAR+ and the Company’s website.

Patrick Downey
President and Chief Executive Officer

Vanessa Pickering
Manager, Investor Relations

Tel: 1 778 945 8977 / Toll Free: 1 888 673 0663
info@orezone.com / http://www.orezone.com

For further information please contact Orezone at +1 (778) 945-8977 or visit the Company’s website at http://www.orezone.com.

The Toronto Stock Exchange neither approves nor disapproves the information contained in this news release.

Cautionary Note Regarding Forward-Looking Statements

This press release contains certain information that constitutes “forward-looking information” within the meaning of applicable Canadian Securities laws and “forward-looking statements” within the meaning of applicable U.S. securities laws (together, “forward-looking statements”). Forward-looking statements are frequently characterized by words such as “plan”, “expect”, “project”, “intend”, “believe”, “anticipate”, “estimate”, “potential”, “possible” and other similar words, or statements that certain events or conditions “may”, “will”, “could”, or “should” occur, and include, amongst other statements, the Phase II hard rock expansion setting the path for Bomboré to increase annual gold production by 50% within the next 12 months and that Bomboré can grow into a 7 to 10 million ounce orebody.

All forward-looking statements are subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those projected in the forward-looking statements including, but not limited to, terrorist or other violent attacks, the failure of parties to contracts to honour contractual commitments, unexpected changes in laws, rules or regulations, or their enforcement by applicable authorities; social or labour unrest; changes in commodity prices; unexpected failure or inadequacy of infrastructure, the possibility of project cost overruns or unanticipated costs and expenses, accidents and equipment breakdowns, political risk, unanticipated changes in key management personnel, the spread of diseases, epidemics and pandemics diseases, market or business conditions, the failure of exploration programs, including drilling programs, to deliver anticipated results and the failure of ongoing and uncertainties relating to the availability and costs of financing needed in the future, and other factors described in the Company’s most recent annual information form and management’s discussion and analysis filed on SEDAR+ on http://www.sedarplus.ca. Readers are cautioned not to place undue reliance on forward-looking statements.

Forward-looking statements are based on the applicable assumptions and factors management considers reasonable as of the date hereof, based on the information available to management at such time. These assumptions and factors include, but are not limited to, assumptions and factors related to the Company’s ability to carry on current and future operations, including: development and exploration activities; the timing, extent, duration and economic viability of such operations, including any mineral resources or reserves identified thereby; the accuracy and reliability of estimates, projections, forecasts, studies and assessments; the Company’s ability to meet or achieve estimates, projections and forecasts; the availability and cost of inputs; the price and market for outputs, including gold; foreign exchange rates; taxation levels; the timely receipt of necessary approvals or permits; the ability to meet current and future obligations; the ability to obtain timely financing on reasonable terms when required; the current and future social, economic and political conditions; and other assumptions and factors generally associated with the mining industry.

Although the forward-looking statements contained in this press release are based upon what management of the Company believes are reasonable assumptions, the Company cannot assure investors that actual results will be consistent with these forward-looking statements. These forward-looking statements are made as of the date of this press release and are expressly qualified in their entirety by this cautionary statement. Subject to applicable securities laws, the Company does not assume any obligation to update or revise the forward-looking statements contained herein to reflect events or circumstances occurring after the date of this press release.

About Web3Wire
Web3Wire – Information, news, press releases, events and research articles about Web3, Metaverse, Blockchain, Artificial Intelligence, Cryptocurrencies, Decentralized Finance, NFTs and Gaming.
Visit Web3Wire for Web3 News and Events, Block3Wire for the latest Blockchain news and Meta3Wire to stay updated with Metaverse News.
ShareTweet1ShareSendShare2
Previous Post

Leading Venture Capital Firms Shaping the Future of Crypto Investments

Next Post

Vasant Masala enters a new era with Anil Kapoor as brand new, unveiling new logo and identity

Related Posts

Ant O&M: Streamlining Global ICT Procurement and Deployment as a China Top Networking Equipment Service

In the modern enterprise landscape, maintaining a robust, efficient, and cost-effective Information and Communications Technology (ICT) infrastructure is a perennial challenge. Businesses are frequently bogged down by the complexities of sourcing, managing vendor relationships, and coordinating global logistics for hardware, software, and specialized services. Emerging as a solution to this...

Read moreDetails

Physician Rand Floyd Publishes Mental Health Story

United States, 6th Dec 2025 - Dr. Rand Floyd, a neuroradiologist with nearly two decades of medical practice, has published a memoir titled My Mental Health Story, which chronicles his personal experiences with mental illness and the circumstances that preceded his mental health challenges.Floyd is a 53-year-old physician who completed...

Read moreDetails

PSA Confirms Faster Access: How to Download Your Digital National ID in 2025

The Philippine Statistics Authority is expanding its digital rollout as more Filipinos look for faster ways to access their PhilSys credentials. With millions still waiting for the physical card, the digital national ID has become a practical solution for everyday verification. The PSA says the electronic version is valid, scannable,...

Read moreDetails

PSA Confirms Faster Access: How to Download Your Digital National ID in 2025

The Philippine Statistics Authority is expanding its digital rollout as more Filipinos look for faster ways to access their PhilSys credentials. With millions still waiting for the physical card, the digital national ID has become a practical solution for everyday verification. The PSA says the electronic version is valid, scannable,...

Read moreDetails

Godrej Industries Group’s Assistive Tech Conference promotes accessible and equitable workplaces in India

MUMBAI, India, Dec. 6, 2025 /PRNewswire/ -- Godrej Industries Group recently hosted its inaugural Assistive Tech Conference 2025, bringing together innovators, corporates, researchers, disability-rights leaders, and athletes to reimagine how technology can transform accessibility and inclusion at work. Celebrating the International Day of Persons with Disabilities, the conference served as...

Read moreDetails

Godrej Industries Group’s Assistive Tech Conference promotes accessible and equitable workplaces in India

MUMBAI, India, Dec. 6, 2025 /PRNewswire/ -- Godrej Industries Group recently hosted its inaugural Assistive Tech Conference 2025, bringing together innovators, corporates, researchers, disability-rights leaders, and athletes to reimagine how technology can transform accessibility and inclusion at work. Celebrating the International Day of Persons with Disabilities, the conference served as...

Read moreDetails

From Concept to Completion: The Custom Home Building Process in Joplin, MO

Image: https://www.abnewswire.com/upload/2025/12/5d47d6a5afda50373383532cb9d682b6.jpgBuilding a custom home in Joplin, MO, is the ultimate dream for many families. It is the chance to create a space that perfectly matches your lifestyle, from the kitchen layout to the bedroom count. This journey is exciting, but it is also a complex, multi-stage process. Understanding the...

Read moreDetails

Tripping Breakers? A Homeowner’s Guide to Electrical Issues in Massillon, OH

Image: https://www.abnewswire.com/upload/2025/12/8df939ae7f8717579429b760f4685325.jpgA circuit breaker that constantly trips is more than just an annoyance; it is your home's electrical system issuing a serious warning. The breaker is a vital safety device designed to cut power when it detects a problem, preventing overheating and fire. For homeowners in Massillon, OH, a tripping...

Read moreDetails

A Homeowner’s Guide to Generator Installation with an Electrician in Rigby, ID

Image: https://www.abnewswire.com/upload/2025/12/d922677d132998191b548fc424beda47.jpgA power outage in Rigby, ID, can be a serious disruption, especially during a harsh winter. A home generator is the best solution for ensuring your family's safety, comfort, and security when the grid goes down. While a portable generator is a temporary fix, a whole home standby generator...

Read moreDetails

A Guide to Security Camera Installation from a Professional Electrician in Modesto, CA

Image: https://www.abnewswire.com/upload/2025/12/e8ac1577fb51160d0d862d5cc1074791.jpgHome security cameras are an essential tool for protecting your property and family in Modesto, CA. While many cameras are available as DIY solutions, integrating a permanent, hardwired security system is a complex electrical task. To ensure reliability, safety, and a professional aesthetic, installation must be handled by a...

Read moreDetails
Web3Wire NFTs - The Web3 Collective

Web3Wire, $W3W Token and .w3w tld Whitepaper

Web3Wire, $W3W Token and .w3w tld Whitepaper

Claim your space in Web3 with .w3w Domain!

Web3Wire

Trending on Web3Wire

  • Unifying Blockchain Ecosystems: 2024 Guide to Cross-Chain Interoperability

    133 shares
    Share 53 Tweet 33
  • Understanding Soulbound Tokens SBT Their Definition and Significance

    39 shares
    Share 16 Tweet 10
  • Top 10 DeFi Platforms to Explore for 2024

    9 shares
    Share 4 Tweet 2
  • Discover 2025’s Top 5 Promising Low-Cap Crypto Gems

    83 shares
    Share 33 Tweet 21
  • Top 5 Wallets for Seamless Multi-Chain Trading in 2025

    68 shares
    Share 27 Tweet 17
Join our Web3Wire Community!

Our newsletters are only twice a month, reaching around 10000+ Blockchain Companies, 800 Web3 VCs, 600 Blockchain Journalists and Media Houses.


* We wont pass your details on to anyone else and we hate spam as much as you do. By clicking the signup button you agree to our Terms of Use and Privacy Policy.

Web3Wire Podcasts

Upcoming Events

There are currently no events.

Latest on Web3Wire

  • Ant O&M: Streamlining Global ICT Procurement and Deployment as a China Top Networking Equipment Service
  • Physician Rand Floyd Publishes Mental Health Story
  • PSA Confirms Faster Access: How to Download Your Digital National ID in 2025
  • PSA Confirms Faster Access: How to Download Your Digital National ID in 2025
  • Godrej Industries Group’s Assistive Tech Conference promotes accessible and equitable workplaces in India

RSS Latest on Block3Wire

  • Covo Finance: Revolutionary Crypto Leverage Trading Platform
  • WorldStrides and HEX Announce Partnership to Offer High School and University Students Innovative Courses Designed to Improve Their Outlook in the Digital Age
  • Cathedra Bitcoin Announces Leasing of 2.5-MW Bitcoin Mining Facility
  • Global Web3 Payments Leader, Banxa, Announces Integration With Metis to Usher In Next Wave of Cryptocurrency Users
  • Dexalot Launches First Hybrid DeFi Subnet on Avalanche

RSS Latest on Meta3Wire

  • Thumbtack Honored as a 2023 Transform Awards Winner
  • Accenture Invests in Looking Glass to Accelerate Shift from 2D to 3D
  • MetatronAI.com Unveils Revolutionary AI-Chat Features and Interface Upgrades
  • Purely.website – Disruptive new platform combats rising web hosting costs
  • WEMADE and Metagravity Sign Strategic Alliance MOU to Collaborate on Blockchain Games for the Metaverse
Web3Wire

Web3Wire is your go-to source for the latest insights and updates in Web3, Metaverse, Blockchain, AI, Cryptocurrencies, DeFi, NFTs, and Gaming. We provide comprehensive coverage through news, press releases, event updates, and research articles, keeping you informed about the rapidly evolving digital world.

  • About Web3Wire
  • Web3Wire NFTs – The Web3 Collective
  • .w3w TLD
  • $W3W Token
  • Web3Wire DAO
  • Event Partners
  • Community Partners
  • Our Media Network
  • Media Kit
  • RSS Feeds
  • Contact Us

Whitepaper | Tokenomics

Crypto Coins

  • Top 10 Coins
  • Top 50 Coins
  • Top 100 Coins
  • All Coins – Marketcap
  • Crypto Coins Heatmap

Crypto Exchanges

  • Top 10 Exchanges
  • Top 50 Exchanges
  • Top 100 Exchanges
  • All Crypto Exchanges

Crypto Stocks

  • Blockchain Stocks
  • NFT Stocks
  • Metaverse Stocks
  • Artificial Intelligence Stocks

Media Portfolio: Block3Wire | Meta3Wire

Web3 Resources

  • Top Web3 and Crypto Youtube Channels
  • Latest Crypto News
  • Latest DeFi News
  • Latest Web3 News

Blockchain Resources

  • Blockchain and Web3 Resources
  • Decentralized Finance (DeFi) – Research Reports
  • All Crypto Whitepapers

Metaverse Resources

  • AR VR and Metaverse Resources
  • Metaverse Courses
Claim your space in Web3 with .w3w!
Top 50 Web3 Blogs and Websites
Web3Wire Podcast on Spotify Web3Wire Podcast on Amazon Music 
Web3Wire - Web3 and Blockchain - News, Events and Press Releases | Product Hunt
Web3Wire on Google News
  • Privacy Policy
  • Terms of Use
  • Disclaimer
  • Sitemap
  • For Search Engines
  • Crypto Sitemap
  • Exchanges Sitemap

© 2024 Web3Wire. We strongly recommend our readers to DYOR, before investing in any cryptocurrencies, blockchain projects, or ICOs, particularly those that guarantee profits.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Add New Playlist

No Result
View All Result
  • Coins
    • Top 10 Cryptocurrencies
    • Top 50 Cryptocurrencies
    • Top 100 Cryptocurrencies
    • All Coins
  • Exchanges
    • Top 10 Cryptocurrency Exchanges
    • Top 50 Cryptocurrency Exchanges
    • Top 100 Cryptocurrency Exchanges
    • All Crypto Exchanges
  • Stocks
    • Blockchain Stocks
    • NFT Stocks
    • Metaverse Stocks
    • Artificial Intelligence Stocks

© 2024 Web3Wire. We strongly recommend our readers to DYOR, before investing in any cryptocurrencies, blockchain projects, or ICOs, particularly those that guarantee profits.

This website uses cookies. By continuing to use this website you are giving consent to cookies being used. Visit our Privacy and Cookie Policy.